Start with the stack
Provide the stack model, electrode-compartment drawing and separation objective. Identify the active area and the space available for the electrode.
Coordinate the interfaces
Review mounting, electrical connections, electrode-rinse solution and power-supply conditions with the stack designer.
Prepare project documents
Include the current drawing revision, operating-current information, material and coating requirements, quantities and requested inspection documents.
Confirm the configuration
The final electrode specification is confirmed against the actual compartment design and operating conditions. Product photographs illustrate configuration options.


